Menu
Call (859) 287-2966

Explore WarehouseDirect

Search flooring & answers

Start typing to search our flooring, FAQ, and locations.

Free measurement · No obligation

Know exactly how much flooring you need before you buy.

Get a room measurement and a practical material plan before comparing box counts, waste and total flooring cost.

  • Plan the right number of boxes
  • Reduce overbuying and last-minute shortages
  • Compare exact material cost before you commit

We sell flooring. We do not install it. Your home is measured by a separate installer who does not work for WarehouseDirect.US.

Request your free measurement

Send your project details to your selected warehouse and our sales team. We’ll contact you to help with an installer referral.

By submitting, you agree that our team may call or text you about this request. This is a request, not a confirmed appointment.

Call for questions

Know who you’re working with

Your installer is independent.
We only make the introduction.

We do not install flooring.

WarehouseDirect.US sells flooring. The person coming to measure is an independent installer who does not work for WarehouseDirect.US.

Insurance and positive reviews.

We refer installers who carry liability insurance and have received positive customer reviews. You choose whether to work with the installer we refer.

No referral fees.

We do not take referral fees or commissions from installers. We make the introduction without taking a cut of their work.

You work directly with the installer.

After the referral, you and the installer handle the measurement visit directly. Any installation quote, agreement, scheduling, payment and workmanship questions are between you and that installer. WarehouseDirect.US does not manage or perform the installer’s work.

Prices and specifications shown onlineCompare products before you visit.
No-pressure educationGet straight answers about quantity and specs.
Prepared pickup planningConfirm product and quantity before driving.

What the measurement solves

Measure the rooms. Plan the whole project.

Start with the spaces you want to update, then turn the measurements into a complete material and installation plan. Use these steps to work through the details with your warehouse and independent installer, from the first request to the final walkthrough.

Finished room with luxury vinyl plank flooring
See all 8 project planning steps
  1. Start with the rooms you want to update

    Decide which rooms, hallways and closets will receive new flooring, and note any areas you are leaving alone. Tell us about stairs, occupied rooms or other details that could affect the visit. Submit the request above so your selected warehouse can help arrange the next step.

  2. Measure every space and connection

    Have each room measured individually, including closets, alcoves and connected hallways. Record doorways, changes in floor height and the direction you would like the planks to run. A room-by-room plan is more useful than the square footage listed for the whole house.

  3. Choose your floor and calculate the boxes

    Compare samples, product specifications and the selected floor’s coverage per box. Have your installer plan the layout and allowance for cuts, then round the order up to whole boxes. Diagonal layouts, small spaces and unusual room shapes can change the allowance; the example below illustrates the calculation rather than setting a rule for every project.

  4. Check the subfloor and moisture requirements

    Ask your installer to check the existing surface for flatness, damage and moisture before agreeing on the installation scope. Identify any removal, repairs, leveling, moisture testing or approved barrier that may be needed. Follow the exact flooring manufacturer’s requirements, and agree on how newly discovered preparation work will be priced.

  5. List transitions, stairs and finishing details

    Walk through each doorway and change in flooring to identify the transitions and compatible profiles the project needs. Include stair treads, risers and nosing where applicable, plus baseboards, shoe molding or quarter round. Confirm colors, quantities and who will supply and install each item so these details are included in the budget.

  6. Compare complete written installer quotes

    Use the same measurements and material plan to request quotes from 2–3 independent installers. Compare removal and disposal, furniture or appliance handling, floor preparation, trim, cleanup and any exclusions—not just a labor price per square foot. Confirm insurance, scheduling, payment terms and the workmanship warranty; installation is a separate agreement with the professional you choose.

  7. Confirm the order and plan material handling

    Review the final box count, accessories and current material price with your selected warehouse before placing the order. Confirm stock, product lot availability, pickup or delivery arrangements and order timing. Agree on who will unload and move the flooring, and follow the product’s storage and acclimation instructions before installation.

  8. Walk the finished project and keep a spare box

    Review the completed floor with your installer, including edges, transitions, stairs and any items that still need attention. Keep the product labels, purchase records and care instructions together. Set aside one unopened extra box for future repairs, beyond installation waste, and store it flat in dry, climate-controlled conditions; manufacturer storage requirements take precedence.

Why customers start with a measurement

Know the material plan before you buy.

An illustrative project

Room size is only the starting point.

850sq. ft. measured area
85sq. ft. for cuts (10%)
935sq. ft. before box rounding

Example only: 850 sq. ft. × 1.10 = 935 sq. ft. Divide by the selected product’s box coverage and round up to whole boxes. Layout and manufacturer instructions determine the actual allowance; 10% is not a rule for every project.

Ready to plan your floor?

Request a free measurement.

Start with the project size. Then compare exact box counts, specifications and material cost.